TSX-V: STUD
Last: 0.10
Change: 0.01
Vol: 113,485
OTCQB: STLNF
Last: 0.07
Change: 0.006
Vol: 57,277

Cigar Lake East & Roughrider South Project

Project Highlights

Location

Infrastructure

Overview

The Cigar Lake East project consists of 2 claims covering an area of 2,298 hectares in the Wollaston Domain in the Eastern Athabasca Basin. The property is situated 23 km east of the Cigar Lake mine.

The Roughrider South project consists of 2 mineral claims situated 16 km southwest of the McClean Lake deposit.

A VTEMTM Plus was completed on both properties in the winter of 2023.

2023 VTEMTM Plus – 315 line-kms (Cigar East)

2023 VTEMTM Plus – 156 line-kms (Roughrider South)

 

Subscribe to our Newsletter